Carbon can fund the last mile, but only for a distributor that already knows who is paying, who is still using the product and who is being counted.
Last mile distributors (LMDs) that sell solar lights, cookstoves and water filters are being pushed in two directions at once. One message is that the moment they sell on instalments they become banks and must run credit like one. The other is that carbon revenue can rescue thin margins and pay for cheaper kit. A Global Distributors Collective (GDC) report published on 28 April 2026 sets out what a carbon project costs and demands. Two webinar decks from the Micro Asset Finance Lab (MAF Lab), dated 2 and 9 June 2026, set out what running a loan book demands. Read together they raise one question for every distributor, and for any farmer cooperative that sells inputs or equipment on credit: can you run a distribution business, a lending business and a carbon business at the same time, and in what order?
Read this first. We read the whole GDC report, Carbon credits in the last mile distribution sector 2026, both MAF Lab decks slide by slide (2 June, for established PAYGo operators, and 9 June, for those starting out), the GDC knowledge hub page and a Zoom confirmation for GDC’s carbon credits webinar of 5 March 2026. We did not attend any of the sessions and do not report what was said in them. We ran no new web searches, so every figure comes from those documents, and we have not read the sources behind them (Ecosystem Marketplace, MSCI, the World Bank and USAID guides). MAF Lab’s benchmarks are its own and cannot be checked from the slides. Charts and numbers marked “our arithmetic” are calculations we made from the documents’ figures, not findings of their authors. Where the documents disagree we show both. In a second pass we added ten sources published before June 2026 (research, rules and practitioner work). We read some only through abstracts, press summaries or law firm summaries, and say which. We left out anything dated June 2026 or later, as you asked.
GDC carbon report (April 2026); MAF Lab decks (2 June 2026). MAF Lab figures are its own benchmarks
Nine findings
- Carbon is big money for a small business. Set up is estimated at $173,500 to $378,000, against median annual revenue of $160,000 for GDC members. Self funding is usually not an option.
- Revenue comes late. In the report’s own five year example the project has spent $173,500 before the first credit is sold in year 3.
- Price and government take decide the case. Typical cookstove credits sell for $5 to $15, a premium rated credit for $30, and aviation (CORSIA) credits for $26 to $63, while governments and benefit sharing rules can take 10% to 40%.
- Our arithmetic puts break even between about 17,300 and 76,600 units a year at a $5 credit, depending on costs and government take. The report’s own rule of thumb is 30,000 to 100,000 units or more.
- Credits need customers who keep using the product. MAF Lab’s data show early payment predicts who stays: 84% of customers paying under 10% of instalments in the first three months end up repossessed or written off, against 7% of perfect payers.
- The loan book is its own business. MAF Lab reports 72% of loan value collected at 1.5× tenor and a 51% completion rate. On the slide’s example unit, break even needs about 85% collected.
- Credit discipline is organisation, not software. Two teams, a credit team that can say no, four onboarding checks in order, a 90 day follow up and cohort tracking.
- The research is blunter than the market. Peer reviewed work found cookstove credits overstated about 9 to 11 times, and the standard setter has since rejected the rules behind 64% of the credits then on offer. Measurement, not marketing, is what buyers will pay for.
- The order matters. Our reading of both sources: fix the loan book, get customer data in order, test the carbon case on paper, then pick a route, which may be to partner, to aggregate or to wait.
Why the two papers belong together
MAF Lab’s opening argument is blunt: the label PAYGo is marketing, and what a distributor is doing underneath is micro asset finance, extending credit to buy a physical asset, then scoring, underwriting, monitoring and collecting. Its 9 June deck asks whether the audience wants to set up a bank, because that is what offering credit amounts to. The GDC report adds a third job. One interviewed founder, Bidhaa Sasa’s CEO, describes the company as a carbon finance firm rather than a distributor after currency depreciation and inflation cut a 40% margin to 15%. Put the three side by side and each has a different goal, a different clock and different skills.
Left and middle: MAF Lab, 2 and 9 June 2026 decks. Right: our summary of the GDC report’s requirements. The third column is our framing, not the report’s
The decks’ most useful sentence is that a customer who wants the product is not automatically eligible for the loan. The carbon report has a parallel one: a project the distributor cannot verify is a project buyers will not pay for. Both are about proof. One asks for proof that the customer will pay, the other for proof that the customer is still using what was sold.
The market carbon sells into
The report’s first message is that carbon buyers have become choosy. It cites Ecosystem Marketplace for a fall in the value of the voluntary carbon market (VCM) from $2 billion in 2021 to $535 million in 2024, and a 25% fall in transaction volumes in 2024, following investigations into over crediting. Avoidance credits, the type nearly every LMD sells, are in less demand than removal credits, which fetched a much higher average price in 2024. The compliance markets pay more but demand more: aviation’s CORSIA scheme, in a voluntary phase until 2027, needs letters of authorisation and corresponding adjustments from host governments, and Article 6 of the Paris Agreement is still being turned into national rules.
Value of credits traded on the voluntary carbon market, US$ million. Ecosystem Marketplace as cited in the GDC report; the 73% fall is our arithmetic
Price is where this bites. The report puts typical technology based avoidance credits, such as those from clean cookstoves, at $5 to $15. EcoSafi, a Kenyan pellet and stove maker, announced a $30 credit in 2024 after it showed product quality (a Tier 5 gasifier stove), methodology quality (Gold Standard’s metered and measured cooking methodology) and project quality (the first ‘A’ rating from BeZero Carbon for a clean cooking project). Aviation credits are priced higher still but come with government paperwork.
US$ per credit. Typical range and EcoSafi: GDC report; CORSIA: MSCI as cited in the report. The cash flow example in the report’s Appendix 4 assumes $5
Quality also depends on the rulebook the project is built under. The report’s Appendix 3 lists 16 methodology entries relevant to distributors and notes whether the Integrity Council’s Core Carbon Principles (CCP) label applies. Counting them ourselves, five are CCP compliant, all for cookstoves and biogas, seven are not and four are not yet reviewed. None of the solar and productive use entries is compliant yet. Projects can still use non compliant methodologies, but the report warns that pricing and demand may suffer.
Entries in the GDC report’s Appendix 3, grouped by sector; the count is ours. Tiles are sorted by status, not in the report’s order
Who is in a carbon project, and how long it takes
The report lists eight kinds of stakeholder. Four sit in the transaction: the project developer (often the manufacturer or distributor, sometimes a consultant on a revenue share), the communities that buy the kit, the buyers (companies and, increasingly, countries) and intermediaries such as consultants, platforms and brokers. Four sit in the assurance layer: the standards body that issues credits, the auditors (validation and verification bodies, or VVBs), the rating agencies and governments, which set rules, may charge fees and may also buy.
Our drawing of the stakeholders in the GDC report’s Figure 1 and Table 3
The report splits set up into nine stages in three phases: design (feasibility, project design document, financing), development and monitoring (validation, registration, implementation) and issuance (verification, issuance, sales). Adding the typical stage durations, our arithmetic gives 13 to 27 months from feasibility to issuance, with financing running alongside. The report itself says set up takes at least two years, with first credits in year 3, and its risk table speaks of around four years before revenue accrues.
Months, typical range for technology based projects. GDC report, Tables 4 to 6. Financing runs alongside the design stages; sales can start straight away with a pre purchase deal or wait up to two years
Green bars are design, amber development and monitoring, blue issuance and sales.
What it costs
The report estimates set up at $173,500 to $378,000, built from interviews with carbon developers, a World Bank guide for Kenyan enterprises, a USAID playbook and the Verra and Gold Standard fee schedules. Ongoing verification adds $50,000 to $150,000 per annual cycle, plus a review fee and a per credit issuance levy. The biggest and most uncertain items are the project design document and the feasibility study, which can be done in house only if the expertise exists. The report warns that this is often a false economy.
US$, low to high estimate per item. GDC report, Table 8
The comparison that matters for a typical member is with its own size. The report’s conclusion notes that median annual revenue among GDC members is $160,000. The cheapest set up already exceeds that, and a three year project at the report’s own low and high estimates costs $329,500 to $843,000 before any per credit levies.
US$ thousand. Median member revenue and cost estimates: GDC report. Three year totals use the report’s Table 8 assumption of three verification cycles
Who pays upfront
Because credits arrive years after the spending, the report says external capital is essential. The most common and accessible forms today are pre purchase agreements and debt; partnerships can cover part of the costs in exchange for a cut. Carbon insurance is becoming a standard risk tool: cover for under delivery, for political and regulatory change (including CORSIA revocation) and for a buyer defaulting.
| Instrument | What it does | Upfront money? |
|---|---|---|
| Pre purchase agreement | Buyer or intermediary funds development in return for a fixed volume at a fixed price | Yes |
| Streaming agreement | Buyer pays a deposit for a percentage of future credits over a set period | Yes |
| Offtake agreement | Buyer commits to buy a set volume after issuance; may help raise capital or serve as collateral | No |
| Brokerage agreement | Broker sells credits for a commission; can be combined with a pre purchase | No, unless combined |
| Equity | Investors take part ownership and share future credit and other revenue | Yes |
| Debt | Lender may take credits as collateral; specialist carbon lenders are still rare | Yes |
| Grants | Ideal for de risking early costs, but supply is limited | Yes |
What governments take
Governments add their own costs. The report says many countries run benefit sharing agreements that deduct 25% to 40% of project revenue for communities and national climate funds. Uganda and Zimbabwe take 10% to 33% of revenue or credits, and Kenya charges $4 per credit for the corresponding adjustment needed to sell on compliance markets. A letter of authorisation can take six months or, in some reported cases, up to four years.
Per cent of credit revenue. Benefit sharing and Uganda/Zimbabwe: GDC report. Kenya: $4 per credit, expressed against the CORSIA phase I price range of $26 to $63, our arithmetic
The report’s Appendix 2 tracks the rules in eight countries. Some are very recent, which is why the report says buyers are waiting to see how the landscape settles.
| Country | Main rules listed | Responsible agency | GDC members with experience |
|---|---|---|---|
| Kenya | Climate Change Act 2016 (amended 2023); Climate Change (Carbon Market) Regulation 2024 | National Environment Management Authority | Aqua Clara Kenya, Bidhaa Sasa |
| Malawi | Carbon Credit and Benefit Sharing Bill 2023; Malawi Carbon Market Framework 2025 | Environmental Affairs Department | Kukula Solar |
| Nigeria | Climate Change Act 2021; National Carbon Market Framework | National Council on Climate Change | None listed |
| Rwanda | National Environment and Climate Change Policy 2019; National Carbon Market Framework 2023 | Rwanda Environment Management Authority | SPOUTS International |
| Tanzania | Environmental Management Act 2004; carbon trading regulations 2023 | National Carbon Registry, Division of Environment | None listed |
| Uganda | National Climate Change Act 2021; National Climate Change Regulations 2025 | Ministry of Water and Environment | SPOUTS International |
| Zambia | Green Economy and Climate Change Act 2024 | Ministry of Green Economy and Environment | Kukula Solar, Namene |
| Zimbabwe | Carbon Trading (General) Regulations 2025 | Zimbabwe Carbon Markets Authority | Namene |
The cash flow test
The report’s Appendix 4 gives a simplified five year example for a cookstove project: 50,000 units sold each year, one credit per unit sold and used, a $5 credit, two years of backdated sales so that 100,000 credits are issued in year 3, then 50,000 in each of years 4 and 5, and the lowest cost estimates throughout. The row the report labels net inflows and outflows is actually a running total, which we checked line by line. The annual figures below are our arithmetic.
US$ thousand. GDC report, Appendix 4: 50,000 units a year, $5 credits, lowest cost estimates. Annual bars are our arithmetic; the running total matches the report
Everything favourable is in that example: the lowest costs, no government take, no staff time, no buffer credits held back, no cost of goods sold and a full 50,000 units a year, with each credit counted for every unit sold and in use. Change the price, the cost case or the government take and the answer moves a lot. The table below recalculates the five year net on the same structure. It is our arithmetic, not the report’s.
| Credit price | Low costs, no government take | Low costs, 40% benefit share | High costs, no government take | High costs, 40% benefit share |
|---|---|---|---|---|
| $5 | $620.5k | $220.5k | $107k | −$293k |
| $10 | $1,620.5k | $820.5k | $1,107k | $307k |
| $15 | $2,620.5k | $1,420.5k | $2,107k | $907k |
Five year net, 50,000 units a year, 200,000 credits issued, $0.25 issuance levy, three verification cycles. Low costs: $173,500 set up and $52,000 per cycle. High costs: $378,000 and $155,000 per cycle. Green: positive. Red: negative. Excludes staff, government fees other than the stated share, buffers and product margin.
The same structure shows how much volume is needed. We solved for the annual unit sales at which the five year net is zero. At $5 the answer runs from about 17,300 units a year in the most favourable case to about 76,600 in the least. The report’s rule of thumb is more than 100,000 units for a standalone project, with interviewees saying at least 30,000 and often nearer 100,000. Our results sit inside that band once government take is included, which suggests the rule of thumb is not far off. Remember that one credit per unit per year suits a cookstove; the yield for a solar light or a water filter is much smaller.
Units sold per year over a five year project, one credit per unit per year. Our arithmetic on the report’s Appendix 4 structure. Dashed lines: the 30,000 and 100,000 thresholds quoted in the report
Amber bars are a $5 credit, green bars a $10 credit.
One more sensitivity links the carbon case to the loan book. Credits are issued for units that are sold and used, and a customer whose kit is repossessed or whose payments have stopped may stop using it. We do not know how many units that affects, and payment is not the same as use, so this is only an illustration. If only a share of the example’s units stayed in verified use, the five year net at $5 and low costs falls as follows, reaching zero when about 35% of units remain in use.
Five year net, US$ thousand, $5 credit, low costs, no government take. Our arithmetic. The 51% marker is MAF Lab’s customer completion rate, used only as an example of a possible share, not a measure of product use
Two clocks that do not match
Credit and carbon also run on different timescales. A distributor can read an early warning on its loan book within three months, but the true repayment rate takes years to emerge. A carbon project is spending money for two years or more before it earns any. The lag in each is the reason both sources insist on leading indicators and on lining up money before spending it.
Months from sale or project start. MAF Lab decks and GDC report. The 13 to 27 months for carbon set up is our sum of the stage ranges and excludes financing; the 3.5 year lag is MAF Lab’s statement on its 2 June deck
Blue is the loan book, amber the carbon project.
What a loan book takes
GDC’s own numbers show how common lending already is. Its 2 June and 9 June slides say over 70% of members offer some kind of customer finance. Of those, a bit less than half do it through partnerships with microfinance institutions and other lenders, and a bit more than half lend directly, through PAYGo, instalment plans, energy as a service or payroll deductions.
Ten person pictogram from the GDC slide, “over 70%” offering finance, “a bit less than half” of those via partners and “a bit more than half” directly. The drawing is illustrative, not exact data
MAF Lab then asked its audience three questions and gave benchmark answers. If a company sells a $100 product on a two year loan, how much does it collect after three years? On average, 72%, from a MAF Lab benchmark of 24 companies in 2025 that it says GOGLA data corroborates. What share of customers have fully paid by then? 51%, from 27 companies and 4.2 million contracts. And what is the typical default rate at microfinance institutions serving the same customers? Under 5%. MAF Lab’s reading is that the customers are the same, so the difference is how the credit is managed. The 9 June deck’s poll options are worded slightly differently from the 2 June deck’s, but the answers are the same.
MAF Lab benchmarks, 2025, as shown on its slides. Not audited. The two measures differ: value collected, and customers who finish
The consequence for the unit economics is the slide’s point about the sale. In MAF Lab’s illustrative single unit, a $200 sale costs $120 for the product and $50 for sales and operations, so collecting $170 is break even and collecting $150 loses $20. That makes break even a repayment rate of 85%, our arithmetic. If the 72% benchmark applied to that unit it would collect $144 and lose $26. It is an illustration, not a benchmark, but it explains why the deck says a sale is not a profit until the loan is repaid.
US$ collected per $200 sale, against $170 of cost. Unit economics from the MAF Lab slide; 85% and the 72% case are our arithmetic and illustrative
Early behaviour is the signal
MAF Lab’s key idea is that customers do not change: early payment predicts the outcome almost perfectly. In its portfolio data across several companies in 2024 and 2025, 84% of customers paying less than 10% of scheduled instalments in the first three months end up repossessed or written off, against 7% of those paying everything on time. This is the basis for its leading indicator, Paid versus Plan at 90 days (PvP90): the amount collected from a cohort in its first 90 days divided by the amount scheduled, with any overpayment capped so it does not mask other customers. In the deck’s worked example, 20 customers owing $0.50 a day were scheduled to pay $900 and paid $675, a PvP90 of 75%.
Share of customers repossessed or written off, by Paid versus Plan in the first three months. MAF Lab portfolio data, multiple companies, 2024 to 2025, as shown on its slide
Worked example from the 9 June MAF Lab deck. The deck’s warning: a customer who owes $90 in 90 days and pays $150 counts only $90.
The five pillars, as taught to two audiences
MAF Lab’s answer is five pillars, with culture as the root. The 2 June deck, for established operators, describes what good looks like and the traps. The 9 June deck, for those starting out, gives the minimum viable version of each. We set them side by side. Some thresholds differ between the decks, which we flag.
| Pillar | Established operators (2 June) | Starting out (9 June) |
|---|---|---|
| 1 Culture | Culture is signals, not posters. Fight “FMCG culture creep”. Celebrate good credit as loudly as sales; treat every default as a company learning event | Everyone knows you are a bank. Learn from failure. Zero tolerance for fraud, such as an agent claiming a small solar kit can power a TV |
| 2 Organisation | Two teams: sales agents for the product, customer care officers for credit. Credit reports to the CFO or CEO, never to the commercial manager. The officer owns the customer from decision to last payment | Build two teams before you start, even if it is two people. Credit has veto power; sales can always sell for cash |
| 3 Onboarding | A four step risk gate: appetite, information, capacity, willingness. Disposable income above 2× the instalment for fixed incomes, 3× for seasonal. At least one reference, called | Four checks in order, stop at the first no. No automated decisions. Call 10 recent defaulters and feed what you learn back into onboarding |
| 4 Engagement | A check in call between sale and first payment. First three months at 80% to 90% of expected or offboard. Prioritise by money at risk: amount owed × days inactive ÷ 60 | A scheduled welcome call. Call the day a first payment is missed. Below 70% to 80% at 90 days, return the unit and refund |
| 5 KPIs | North star: repayment rate at 1.5× tenor. Use PvP90 as the leading proxy, plot cohort collection curves, avoid PAR30 as it is distorted by sales | Build collection curves; add PvP90 as the early warning |
The onboarding ladder is the part most worth copying. MAF Lab’s flow chart has a distributor ask, in order, whether the customer wants the product, whether they could simply pay cash, whether they are willing to go through financing eligibility, whether they have understood the obligations, whether they can afford continuous instalments, and whether they will keep paying. A no at any step stops the loan.
Redrawn from the MAF Lab flow chart (2 June deck). The sequence and the stops are MAF Lab’s; the cash sale branch is shown as on the slide
MAF Lab also argues that most defaults are preventable. It asked defaulting customers why, and its slide separates nine reasons visible at onboarding from three that are random. The count is of reasons listed, not of defaulters, so it says nothing about how many customers fall into each group.
| Visible at onboarding (9 reasons) | Genuinely random (3 reasons) |
|---|---|
| No real need for the product; was not told they pay every day; far from mobile money; is not the actual user; does not know how to pay; did not understand the price; income cannot cover the instalments; travels often; no network coverage | Illness, accident or death; job loss; the product breaks |
Not everyone should run credit. MAF Lab’s FAQ gives a readiness test for in house credit: a dedicated team separate from sales, a CRM that tracks PvP, PAR7 and cohorts, a monthly cohort review, leadership committed to a 12 to 18 month change and a chief credit officer who reports to the board. It also warns that companies slide back to PAYGo 1.0 in two cases: a fundraising round that demands growth, or a new commercial director who does not understand credit. For those who do not want the work, it offers an off ramp: externalise credit to a microfinance institution, a commercial bank, a savings cooperative (SACCO) or group lending, or partner with an energy as a service company or an asset financier. Five things should be aligned before signing: geographic reach, ticket size, credit assessment timing (hours, not days), who handles after sales and repossession, and who brings clients to whom.
Where the two playbooks meet
Neither source tells a distributor what to do about both. The report says a distributor may reasonably decide carbon set up is prohibitive and focus on the rest of the business. MAF Lab says a distributor may prefer to do operations and leave credit to a lender. Putting them together gives a set of choices, each with a clear price of entry. The last column is our reading of when each fits.
| Choice | What it demands (from the sources) | Fits when (our read) |
|---|---|---|
| Run credit in house | Separate credit team reporting to the CFO or CEO, cohort tracking, 12 to 18 months of change, strong early warning habits | Leadership will back a lending culture and can afford two teams |
| Externalise credit | A partner lender; align reach, ticket size, decision speed, repossession duties and who brings the clients | You want to focus on selling, installing and servicing |
| Build your own carbon project | $173,500 to $378,000 set up, a finance function, systems tracking 100% of customers, scale of tens or hundreds of thousands of units, patient capital | You already sell at scale and hold usage data |
| Carbon through a partner | Five models in the report: a discount in return for the manufacturer’s credit rights, a waiver of those rights, a programme, an intermediary or a platform. Settle accountabilities and revenue share first | You cannot fund the set up but can supply customer data and after sales service |
| Join an aggregated project | Nascent; few case studies; Clean Cooking Alliance and others piloting; an added cost layer, shared | You are too small to reach scale alone |
| Leave carbon for now | Focus on other parts of the business, as the report says is a reasonable choice | The loan book or the data are not ready |
The report’s Kukula Solar case shows why this is hard. After acting as a partner on two carbon projects, the Malawian and Zambian distributor found accountabilities confused, outside expectations that did not fit the local context and a high revenue share taken by partners, and moved to a build it yourself project backed by US investors that hopes for 1 million to 1.5 million credits over its life. By contrast, Altech, working with BURN Manufacturing and later an intermediary in the Democratic Republic of Congo, and Agriput Solar, which receives discounted Namene lights in Zimbabwe, use partnership models. These are the companies’ own accounts as reported by GDC.
Our synthesis of the GDC report’s prerequisites and MAF Lab’s five pillars. A proposal, not a finding of either source
The logic is mostly timing. The report’s sixth prerequisite is to confirm buyer demand early, and its tips are to secure a buyer, sort customer data first and avoid negative press by using conservative baselines. MAF Lab’s tips are to pull last year’s defaulters, find the pattern in their first 90 days and ask staff whether the company is a bank. The data work serves both: a distributor that cannot say which customers are paying and still using the kit can neither manage credit nor verify a carbon project. The Kukula Solar founder’s remark in the report is the same idea from the carbon side: the money is in verifiable customer usage data over the life of the project, not in the sale.
There is also a conflict to watch. The report lists carbon revenue as a way to subsidise product and distribution costs, which can reach more customers. MAF Lab’s onboarding rules say income must be above 2× or 3× the instalment, and that a customer who wants the kit may still not be eligible for the loan. If carbon income lowers the price, it lowers the instalment and widens the circle of eligible customers, but only if the credit team still says no to customers who cannot or will not pay. Volume pressure from either side, a fundraising round or a carbon scale target, is exactly the situation MAF Lab says pushes firms back to selling first and lending second.
What the research and the rulebooks say
The report and the decks are practitioner work. We asked a second question: what does the wider record, published before June 2026, establish about carbon in farming and distribution, and who has actually tested it? We found ten sources worth setting beside them: three peer reviewed papers, three policy instruments or standard setter decisions, and four practitioner or press accounts. Each does a different job, and the pattern is the finding.
Ten sources published before June 2026 against four topics. Which topics each covers is our reading, not a classification by the authors
Two things stand out. Research and rules sit almost entirely on the carbon side, and only the agricultural sources touch farming, technology and carbon together. The credit side, meaning what happens when the customer is on a loan, is covered by practitioners alone. We found no peer reviewed paper joining the two, which is the gap this briefing sits in.
How the record built up
Dates as published; the GDC report and the Acumen paper are both April 2026
Science: credits have been overstated, and measurement is the fix
The sharpest evidence is on cookstoves, the product most distributors sell. Gill Wiehl, Kammen and Haya of the University of California, Berkeley, reviewed cookstove projects in Nature Sustainability (2024). Reported by the university and press, they found credits in their sample were overstated about 9.2 times, and about 10.6 times when extrapolated across all credits issued under the five methodologies studied. The reasons were inflated estimates of how many households adopt and use the stoves, underestimates of how long they keep using their old stoves and overestimated effects of fuel collection on forests. Gold Standard’s metered methodology was the closest, still about 1.5 times too high.
Overstatement multiple (1× = accurate). Gill Wiehl, Kammen and Haya, Nature Sustainability 2024, as reported by the authors’ university and press; we did not read the full paper. The sample covered 40% of cookstove credits
The standard setter has acted on this. In March 2025 the Integrity Council for the Voluntary Carbon Market (ICVCM) ruled that two widely used cookstove methodologies could not carry its Core Carbon Principles label, approved Verra’s new methodology and two from Gold Standard, and left others pending, as reported by Climate Home News. This also explains why the GDC report’s Appendix 3 shows so many cookstove entries marked as not compliant.
Climate Home News, 7 March 2025, on the ICVCM decision. Percentages and dates as reported there; we did not read the ICVCM documents. About 28 million credits (33%) under older Gold Standard versions were still awaiting a ruling.
Agriculture: soil carbon, measured, is possible but not free
Farming sits on a different footing. Okoli and Birkenberg of the University of Hohenheim (Climatic Change, 2024) compared nine ways to account for soil organic carbon in smallholder projects, from handheld sensors to satellites and models, using the Western Kenya Soil Carbon Project and five tests: accuracy, standardisation, cost, adoptability and community benefit. From the abstract, remote sensing could lower costs, but it can distance monitoring from the community, and handheld sensors with common protocols could involve farmers directly. Potash, Bradford, Oldfield and Guan (Environmental Research Letters, 2025) argue for direct measure and remeasure sampling, with about 10% of fields sampled across many farms, as an economically workable way to credit soil carbon at scale, and released an open source tool to model project costs. Their evidence comes from commercial scale agriculture, and we read only the press summary.
Read next to the GDC report, this is useful: the report’s concern with proof of customer use is the same problem, solved with the same ingredients, namely direct measurement by sampling, cheap sensors and local people who gather the data.
Smallholders: the old case study that still bites
The oldest source here is the most humbling. Vi Agroforestry’s Kenya Agricultural Carbon Project, described in a 2012 CGIAR case study by Shames, Wekesa and Wachiye, aimed at 64,800 households with the World Bank BioCarbon Fund as the buyer. The authors projected a payment of about $2.47 per farmer per year, assuming $4 a tonne, 0.75 hectares per farmer and 1.37 tonnes per hectare per year, with 60% of revenue going to farmer groups. Staff costs were about 60% of the budget. These were projections made before payment began, and prices and methods have changed since.
Shames, Wekesa and Wachiye, CCAFS case study, June 2012. Per farmer figure checked by us: 0.75 ha × 1.37 t × $4 = $4.11, of which 60% is $2.47. Illustrative of scale and trade offs, not a current price.
Rangeland carbon in northern Kenya shows the same tension at far larger scale. A January 2024 report describes the Northern Kenya Rangelands Carbon Project, begun in 2012, as covering 1.9 million hectares with about $14.6 million of credit revenue so far, and records criticism, including from Survival International, over consent, benefit sharing and the accuracy of verification. The project has also been praised for easing conflict between herders. We have not assessed either side.
Policy: who may sell, who must be paid, what counts
Kenya’s Climate Change (Carbon Markets) Regulations, 2024, in force from 17 May 2024 according to a Kenyan law firm’s summary, create a National Carbon Registry across six sectors that includes agriculture, a multi stage approval route through the Designated National Authority, and a duty to share earnings with communities: at least 40% of the previous year’s aggregate earnings for land based projects on public or community land and at least 25% for non land based ones. This is a floor and it applies to projects on public or community land, which is narrower than the GDC report’s summary of a 25% to 40% deduction. Internationally, the Article 6.4 Supervisory Body adopted a suppressed demand standard in August 2025 that lets basic needs projects set baselines by human need rather than current use. The UN notice does not mention cookstoves, so whether they qualify is open.
Our synthesis of the ten sources above. Cells state what the source type is good for, and what it cannot tell you
| Source type | Establishes | Cannot tell you |
|---|---|---|
| Research | How wrong credits can be; which measurement methods work | Whether a given distributor’s customers still use the kit |
| Rules and standards | Who may sell, who is paid, what counts as a credit | Whether the rule works on the ground |
| Practitioner work | What it costs and where loan books break | How representative it is; most data is the author’s own |
| Press and rights reports | What affected people say | Verified outcomes either way |
The credit side has its own literature
The PAYGo evidence is practitioner led, and the sources agree. CGAP’s Daniel Waldron warned in 2018 that donor and investor pressure to scale could favour volume over borrower quality, citing a Hystra report in which one provider’s write offs tripled after a sales push. He also showed why defaults compound: in his illustration, if 15 of 100 borrowers default the others must pay about 76% more per head than if five do. MAF Lab and Acumen’s April 2026 paper, Is PAYGo Credit Fit for the Next 100 Million Customers?, reaches the same place with newer figures: 51% of customers fully repaid at 1.5 times tenor, about 72% of sales revenue collected on average for GOGLA members, against 95% to 99% repayment at microfinance institutions on loans of similar size, and bad debt of about 24% of the retail price of an average PAYGo system, citing ESMAP. Its main idea, to pilot separating credit from sales, is presented as an experiment and not a settled answer, and it suggests that households living on under about $2 a day may need subsidy or energy as a service rather than credit. One difference to note: that paper puts MAF Lab’s own repayment figure at 71% where the 2 June deck says 72%.
The 2018 and 2026 papers describe the same pressure eight years apart. Figures as reported in each paper; we did not read the underlying datasets
| Claim | CGAP, 2018 | MAF Lab and Acumen, 2026 |
|---|---|---|
| Scale pressure weakens credit | Yes: write offs tripled after a sales push (Hystra) | Yes: sales up 250%, credit team flat, assessments about six minutes |
| Cost of bad debt | 76% more per paying customer at 15% defaults versus 5% (illustration) | About 24% of retail price (ESMAP) |
| Proposed answer | Build a robust credit model first | Pilot separating credit from sales |
Try your own numbers
The cash flow example is only as good as its inputs. Move the sliders to see where your own project would land. It uses the structure of the report’s Appendix 4 (200,000 credits over five years at 50,000 units a year) scaled to your volume, with our assumptions for cost cases, and it is our arithmetic, not the report’s.
Assumes one credit per unit in use, four years of credited sales over five years, three verification cycles, a $0.25 per credit levy, and excludes staff, buffers and product margin.
For Kilimora and a Kenyan cooperative
A farmer cooperative is not a solar distributor, so the lessons carry over with care. Three of them are plain. First, if members buy equipment such as pumps, stoves or filters on instalments through the cooperative or a partner, the cooperative is running micro asset finance and the MAF Lab questions apply: who decides, who says no, who follows up in the first 90 days. Second, the report’s cost and scale numbers are for technology based projects, such as cookstoves, and its notes say validation costs more for nature based ones. Farm carbon is nature based, so the report’s costs, buyers and rules cannot be read straight across. Third, the common thread is verified data on what actually happened on the ground, which is what AgriKonnekt says it is built to check, with sensors, satellites and phone reach.
The Kilimora climate health article in this series shows a range of 24,000 to 180,000 tonnes of verified carbon; we have not checked it here, it is the company’s own figure, and we do not know whether the tonnes are annual or cumulative or whether all would be sold as credits. As a purely illustrative scale test against the report’s cost estimates, at one credit per tonne:
US$ thousand, gross, before levies, fees, set up and verification costs. Tonnage: range from the Kilimora climate health article, unchecked. Our arithmetic, illustrative only
The small figure falls below the cheapest set up at every price but the highest, and the large one clears it comfortably. The point is not the sums. It is that scale decides, which is why the report suggests partnership or aggregation for smaller players. Kenya’s rules in the report’s tracker are the Climate Change Act 2016 (amended 2023) and the 2024 Carbon Market Regulation, overseen by the National Environment Management Authority, with a $4 per credit corresponding adjustment for compliance market sales. The report names Aqua Clara Kenya and Bidhaa Sasa as members with Kenyan carbon experience, and EcoSafi, a Kenyan pellet and stove maker, as the premium price case.
What we would ask for
- Distributors: ask ten staff whether the company is a bank, and pull last year’s defaulters’ first 90 days. If the answers surprise you, fix credit before thinking about carbon.
- Distributors: run the break even sum on your own numbers: price, costs, government take, units and the share still in use. Do it before paying for a feasibility study.
- Funders and GDC: pay for pre feasibility and feasibility work, since the report notes that grant capital is needed and costs of $10,000 to $100,000 sit before any decision.
- Buyers and intermediaries: offer pre purchase and offtake agreements to smaller distributors, as these de risk set up more than any other tool the report lists.
- GDC and partners: publish a trusted consultant list, a live country policy tracker and aggregation pilots, as the report’s recommendations table proposes.
- MAF Lab and GDC: publish the benchmark method (companies, definitions and cohort rules), so members can compare their own 72% and 51% fairly.
- Everyone: measure use, not only sales and payments. The same record serves lenders, verifiers and funders.
- Cooperatives: if you sell on credit, copy the two team rule and the 90 day call. If you are considering carbon, ask what the nature based version costs before using technology based numbers.
Questions worth asking on the day
- At what scale did the report’s interviewed members first see carbon revenue exceed costs, and how long did it take?
- How many GDC members’ loan books would pass MAF Lab’s readiness checklist today?
- MAF Lab’s 72% and 51% come from 24 and 27 companies. Which countries and products, and how many are in GDC’s membership?
- Does early payment also predict continued product use, and could payment records stand in for usage monitoring in a carbon project?
- Who owns the customer data when a manufacturer holds the carbon rights and a distributor holds the loan?
- If a government takes 25% to 40% of credit revenue, how do small projects survive?
- Which lenders already finance carbon set up costs against pre purchase contracts, and on what terms?
- What would count as credible proof of use for a water filter or a solar light, where each unit yields far fewer credits than a cookstove?
What we can and cannot claim
| Statement | Evidence status |
|---|---|
| Set up costs $173,500 to $378,000; verification $52,000 to $155,000 per cycle | GDC report estimates from interviews, a World Bank guide, a USAID playbook and fee schedules; we did not check the originals |
| Median GDC member revenue is $160,000 | GDC report; no method given |
| Voluntary market fell from $2bn to $535m | Ecosystem Marketplace as cited in the GDC report; not read |
| Cookstove credits $5 to $15; EcoSafi $30; CORSIA $26 to $63 | GDC report, citing Engineering for Change and MSCI; not read |
| Break even of about 17,300 to 76,600 units a year at $5 | Our arithmetic on the Appendix 4 structure; excludes staff, buffers, other fees and product margin; assumes one credit per unit per year |
| 72% of value collected at 1.5× tenor; 51% completion; MFI defaults under 5% | MAF Lab benchmarks (24 and 27 companies, 2025); not audited; slide says GOGLA data corroborates the 72% |
| 84% of very early non payers lost; 7% of perfect payers | MAF Lab portfolio data, multiple companies, 2024 to 2025; not audited |
| Break even collection of 85% on the example unit | Our arithmetic from the slide’s illustrative $200 unit; not a benchmark |
| Early payment also predicts continued product use | Our hypothesis; MAF Lab’s data show repossession and write off, not usage |
| A solid adoption phase removes 90% of future erratic customers | A MAF Lab claim; no data on the slide |
| Over 70% of GDC members offer customer financing | GDC introduction slide; underlying survey not shown |
| Cookstove credits overstated about 9.2 times (sample) and 10.6 times (extrapolated) | Gill Wiehl, Kammen and Haya, Nature Sustainability 2024, as reported by the university and press; full paper not read |
| 64% of cookstove offsets rested on rejected methodologies | Climate Home News on the ICVCM decision, March 2025; ICVCM documents not read |
| Kenya: at least 40% (land based) or 25% (non land) community share | Law firm summary of the 2024 Regulations; regulation text not read; applies to public or community land |
| $2.47 per farmer per year projected in 2012 | CCAFS case study projections; our check of the arithmetic; not outturn |
| Direct sampling of about 10% of fields can credit soil carbon at scale | Potash et al. 2025, press summary only |
| Doing both credit and carbon in the right order is best practice | Our proposal; neither source recommends this sequence |
Where the sources disagree
| Item | What each says |
|---|---|
| 2024 fall in voluntary market volumes | “Dropped 25%” in the takeaways; “25 per cent per annum” in Section 1 |
| Removal versus avoidance price in 2024 | 381% higher in the takeaways; “almost four times” in Section 1.1, which is a smaller gap |
| Issuance fee | $0.20 to $0.25 per credit (Tables 6 and 8); $0.002 to $0.15 (Appendix 1) |
| Registration and listing fees | Registration $2,500 (Table 5) and about $5,000 (Appendix 1); listing $1,000 (Table 5), $1,000 to $3,000 (Table 8), $1,000 to $5,000 (Appendix 1) |
| Scale needed | “Hundreds of thousands” of units (takeaways); more than 100,000 (conclusions); at least 30,000 and often 100,000 (tips) |
| Ongoing costs | “Start at $50,000” (takeaways); $52,000 (Table 6 and conclusions); $50,000 to $150,000 (Section 3) |
| When revenue starts | First credits in year 3 at the earliest; “more than two years”; “around four years” in the risk table |
| Appendix 4 cash flow row | Labelled net inflows and outflows but is a running total |
| MAF Lab’s poll options | Question 2 option C is 50% to 69% on 2 June and 50% to 60% on 9 June; question 3 options B and C are 15% to 20% and below 10% on 2 June, 15% to 25% and below 15% on 9 June |
| MAF Lab’s three month threshold | 80% to 90% of expected or offboard (2 June); below 70% to 80% at 90 days, let go (9 June) |
| Who each session is for | Both say “at least one” of their criteria, so a company meeting one of each qualifies for both |
The honest summary is that carbon can help a distributor that is already large, already disciplined about credit and already holding good customer data, and that it is a poor rescue for one that is not. A distributor with a leaky loan book is likely to have leaky carbon data too, and the report’s own costs would then be spent on credits buyers will not trust. The two sources, written by different people for different audiences, make the same demand: know what happened to every customer, early, and act on it.
Sources & notes
Sources: Global Distributors Collective and Practical Action Publishing, Carbon credits in the last mile distribution sector 2026 (full report; GDC knowledge hub page, published 28 April 2026); MAF Lab and GDC, PAYGo in the Last Mile Distribution Sector webinar decks, 2 June 2026 (established operators) and 9 June 2026 (starting out); Zoom registration confirmation for the GDC webinar Carbon Credits in the Last Mile Distribution Sector, 5 March 2026; Kilimora, AgriKonnekt.
Research and policy added: Gill Wiehl, Kammen and Haya, Nature Sustainability, 2024 (via Phys.org summary); Climate Home News, 7 March 2025 on the ICVCM decision; Okoli and Birkenberg, Monitoring soil carbon in smallholder carbon projects: insights from Kenya, Climatic Change, 2024 (abstract only); Potash, Bradford, Oldfield and Guan, Environmental Research Letters, 2025 (via ScienceDaily); Shames, Wekesa and Wachiye, Vi Agroforestry case study, CCAFS, 2012; FairPlanet, January 2024 on the Northern Kenya Rangelands project; Oraro and Company summary of Kenya’s Climate Change (Carbon Markets) Regulations, 2024; UNFCCC notice on the Article 6.4 suppressed demand standard, August 2025; Waldron, Growth vs sustainability: credit risk in PAYGo solar, CGAP, 2018; MAF Lab and Acumen, Is PAYGo Credit Fit for the Next 100 Million Customers?, April 2026.
Differences between sources: see the table above.
Our own arithmetic: the 73% fall in market value; the sum of stage durations (13 to 27 months); the three year totals checked against the report’s Table 8; the annual cash flows from the Appendix 4 running totals; the five year net scenarios; the break even unit sales; the share in use break even of about 35%; the 85% break even collection and the $144 and $26 figures; the 28% and 49% complements in the doughnuts; Kenya’s $4 expressed as 6% to 15% of a CORSIA priced credit; the count of 16 methodology entries (5 compliant, 7 not, 4 not reviewed); the gross value of Kilimora’s tonnage range; the $2.47 check.
Not read: the full text of the Nature Sustainability, Environmental Research Letters and Climatic Change papers, the ICVCM and Kenyan regulation texts (we used summaries); the webinars themselves (we attended none); the sources behind the GDC report (Ecosystem Marketplace, MSCI, the World Bank and USAID guides); GOGLA’s data; the report’s Table 7 percentages, which are not labelled on the chart. MAF Lab figures and company accounts (Kukula Solar, Altech, Agriput, Bidhaa Sasa, EcoSafi, Kilimora) are as stated by them and not independently audited.